ABEC - a good investment for ONEX’s office refurbishment
ABEC were contracted by Envirotech Building Services to install the building management system for a fit-out of the 3rd floor offices at 8 St James Square.
ABEC were contracted by Envirotech Building Services to install the building management system for a fit-out of the 3rd floor offices at 8 St James Square.
of a 1980s built office block
The control and monitoring system is based on Trend IQ4E products and a Trend 963 supervisor PC.
Phase 2 – Data Centre
ABEC has been appointed by Mercury Engineering to design and install the building management system for Phase 2 of Equinix Zurich ZH5 for Equinix.
ABEC has been appointed by Callisia to carry out the fit work for Accel, following ABEC carrying out the basebuild BMS installation at W5 Regent Street for the Crown Estate.