Case studies

Latest Case Studies

Equinix, Zurich

Phase 2 – Data Centre 

ABEC has been appointed by Mercury Engineering to design and install the building management system for Phase 2 of Equinix Zurich ZH5 for Equinix. 

Read story

W5 Regent Street Fit Out (Accel)

ABEC has been appointed by Callisia to carry out the fit work for Accel, following ABEC carrying out the basebuild BMS installation at W5 Regent Street for the Crown Estate. 

Read story

Aldgate Tower Fit Out

ABEC has been appointed by Kentex Services to carry out the fit out works for UBER, following the successful completion of the basebuild BMS by ABEC. 

Read story