Case studies

Latest Case Studies

ABEC is more than competent

for phase ll at the Composites Centre.

The installation of a building management system (BMS) by ABEC at the National Composites Centre is part of a phase II project to double the size of the South Gloucestershire site.

Read story

ABEC is a ventilation success

at Carillion’s head offices. 

Their ventilation system at Wolverhampton has been modified in order to improve efficiency, save heating and cooling costs and achieve a more comfortable indoor environment for occupants.

Read story

UBS banks on ABEC

with a four-year maintenance contract.

Our flexibility and can-do approach ensuring the customer’s needs are met helped to win the maintenance contract.

Read story

London Calling

at City-fringe Aldgate Tower development.

ABEC has been appointed by Mercury Engineering to design and install a fully integrated building management system at the landmark City-fringe Aldgate Tower development.

Read story